Customization: | Available |
---|---|
Material: | Alloy Steel |
Shape: | Load Binders |
Still deciding? Get samples of US$ 100/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Why Choose Us
Quality Advantage
The certification passed:ISO9001:2008;CE,TUV etc.
More than 20 years factory production and test facility.
The steel raw materials is supplied by large steel factory.
Support Third party inspection.
Machinery Equipment
Over 200 sets of forging,heat treatment,hydraulic punching,mold processing machine.
Over 10 sets of test equipment.
Technology Advantage
Own the largest wind power construction in Asia.
The patent of pulley block.
Founded the academician workstation with more than 200 quality test personnel and mold researchers.
Support OEM.
Service Advantage
Responding to customers'needs within 12 hours.
Ensured delivery within the agreed time.
What are the problems that cranes need to pay attention to when lifting large workpieces? When lifting large workpieces, the crane should grasp and grasp the following essentials: 1. Before work, observe the shape of the workpiece, grasp the center of gravity of the workpiece, and confirm the weight of the workpiece according to the drawing. 2, the correct choice of ropes, shackles, hooks, and another rigging. 3, on the workpiece itself for lifting and the design of rings or lugs, should be carefully examined before the operation, and in all the rings on the Caucasus. 4, the workpiece itself does not have rings, should correctly select the location of the cable point. The crane's hook head is aligned with the center of gravity of the workpiece. 5, note that the angle between the rope should generally be less than 90 degrees. The 6 corners, the rope passes through the angle of protection must be added. 7, lifting machinery should be tested before lifting, confirm the security, and then continue the next step.