Qty. 4 - 1/2" Grade 80 Connecting Link Hammerlock Chain Connector Coupling Link

Product Details
Customization: Available
Material: Alloy Steel
Shape: D Shape
Still deciding? Get samples of US$ 10/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment methods: visa mastercard discover JCB diners club american express T/T
  Support payment in USD
Secure payments: Every payment you make at Made-in-china.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Years of Export Experience
The export experience of the supplier is more than 10 years
Minor Customization
The supplier provides minor customization services such as logo, graphic, package
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO14001
ISO45001:2018 certificate
Product Certification
The supplier's products already have relevant certification qualifications, including:
CE
GS
to see all verified strength labels (27)
  • Qty. 4 - 1/2" Grade 80 Connecting Link Hammerlock Chain Connector Coupling Link
  • Qty. 4 - 1/2" Grade 80 Connecting Link Hammerlock Chain Connector Coupling Link
  • Qty. 4 - 1/2" Grade 80 Connecting Link Hammerlock Chain Connector Coupling Link
  • Qty. 4 - 1/2" Grade 80 Connecting Link Hammerlock Chain Connector Coupling Link
  • Qty. 4 - 1/2" Grade 80 Connecting Link Hammerlock Chain Connector Coupling Link
  • Qty. 4 - 1/2" Grade 80 Connecting Link Hammerlock Chain Connector Coupling Link
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • Company Profile
Overview

Basic Info.

Model NO.
Qty. 4 - 1/2" Grade 80 Connecting Link Hammerlock
Color
Red/Yellow
Condition
New
Transport Package
Plastic Bag and Cartons
Specification
Available in 1.12T TO 31.5T
Trademark
WITHOUT
Origin
Baoding, China
HS Code
7326901900
Production Capacity
500000PCS/Year

Packaging & Delivery

Package Size
50.00cm * 50.00cm * 50.00cm
Package Gross Weight
20.000kg
Lead Time
7 days (1 - 1 Pieces)
To be negotiated ( > 1 Pieces)

Product Description

Product Description

 

Drop Forged G80 Connecting Link

Quick Details Place of Origin: Hebei, China  Model Number: A-337 Structure: Hollow Chain Function: Transmission Chain Material: ALLOY Standard or Nonstandard: Standard Surface Treatment:: Paited Colors(Yellow Or Red,Black) Place of Origin:: Hebei, China (Mainland)  Model Number:: G80 Material:: Super alloy steel forged and tempered Process:: Die forging Packaging:: Bubble plastic bags+ Cartons+ steel pallets name: Connecting Links Hammerlock colour: Yellow,also can be red paint
 

Detailed Photos

 

Qty. 4 - 1/2" Grade 80 Connecting Link Hammerlock Chain Connector Coupling LinkQty. 4 - 1/2" Grade 80 Connecting Link Hammerlock Chain Connector Coupling LinkQty. 4 - 1/2" Grade 80 Connecting Link Hammerlock Chain Connector Coupling LinkQty. 4 - 1/2" Grade 80 Connecting Link Hammerlock Chain Connector Coupling LinkQty. 4 - 1/2" Grade 80 Connecting Link Hammerlock Chain Connector Coupling LinkQty. 4 - 1/2" Grade 80 Connecting Link Hammerlock Chain Connector Coupling LinkQty. 4 - 1/2" Grade 80 Connecting Link Hammerlock Chain Connector Coupling Link

Product Parameters
Product Name Drop Forged G80 Connecting Link
Type European Type
Material IRON, ALLOY
Surface Color coated
Work Load Limite 2.5
Weight/pc 0.14
MOQ 1200
Package Packed by plastic bags then into cartons or by special requirements
Payment Terms T/T, Western Union, Sight L/C, paypal
Delivery time 100-1000pc: 7 days, 1001-10000pc: 3 weeks

G80EUROPEAN TYPE CONNECTING LINK

ITEM NO.

WLL(T)

B.L(T)

A(mm)

B(mm)

C(mm)

L(mm)

WEIGHT(kg)

SL-CT103-6

1.12

0.48

15.4

8

46

60.5

0.08

SL-CT103-7/8

2

8

19

8.5

58.5

76

0.14

SL-CT103-10

3.15/3.2

12.8

25.6

11

70

92

0.32

SL-CT103-13

5.3/5.4

21.2

30.1

15

87.6

117.6

0.66

SL-CT103-16

8

32.8

34

19.1

113.6

152

1.3

SL-CT103-18

10

40

38.4

21

113.5

155.5

1.8

SL-CT103-20

12.5

50

42

22

120

167.8

2.1

SL-CT103-22

15

60

51

26

145.6

197.6

3.4

SL-CT103-26

21.2

84.8

58

30

160.8

222.8

5.2

SL-CT103-32

31.5

126

67.5

37

205.3

281.4

10.4

Company Profile

Why Choose Us

Quality Advantage

  1. The certification passed:ISO9001:2008;CE,TUV etc.

  2. More than 20 years factory production and test facility.

  3. The steel raw materials is supplied by large steel factory.

  4. Support Third party inspection.

Machinery Equipment

  1. Over 200 sets of forging,heat treatment,hydraulic punching,mold processing machine.

  2. Over 10 sets of test equipment.

Technology Advantage

  1. Own the largest wind power construction in Asia.

  2. The patent of pulley block.

  3. Founded the academician workstation with more than 200 quality test personnel and mold researchers.

  4. Support OEM.

Service Advantage

  1. Responding to customers'needs within 12 hours.

  2. Ensured delivery within the agreed time.

What are the problems that cranes need to pay attention to when lifting large workpieces? When lifting large workpieces, the crane should grasp and grasp the following essentials: 1. Before work, observe the shape of the workpiece, grasp the center of gravity of the workpiece, and confirm the weight of the workpiece according to the drawing. 2, the correct choice of ropes, shackles, hooks, and another rigging. 3, on the workpiece itself for lifting and the design of rings or lugs, should be carefully examined before the operation, and in all the rings on the Caucasus. 4, the workpiece itself does not have rings, should correctly select the location of the cable point. The crane's hook head is aligned with the center of gravity of the workpiece. 5, note that the angle between the rope should generally be less than 90 degrees. The 6 corners, the rope passes through the angle of protection must be added. 7, lifting machinery should be tested before lifting, confirm the security, and then continue the next step.

 


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier